Shu · Ha · Ri · the three levels of the method

Lean diagnostic in 10 questions.

Find out which level of the Lean method your project is at (Shu, Ha or Ri) and leave with three actions for next week.

No sign-up: the result appears on screen, right away.

Ten questions · one at a time

Question 01 of 10

Do you measure PPC every week?

PPC (Percent Plan Complete): of the tasks promised for the week, the share that got done.

Answer based on what happens on the project today, not on what should happen.

The result · three levels

Shu, Ha or Ri: where your project stands in the method.

Answer the ten questions: the result appears right here.

  • Shu 0 to 7

    The project is starting out with the method. The first gain comes from measuring the week and giving every impediment an owner.

  • Ha 8 to 14

    The method runs, but the parts don't talk to each other. Planning, quality and cost still each measure in their own way.

  • Ri 15 to 20

    The project practices Lean. The next step is integration: the same number from the budget to the field.

The full checklist · ten questions, one action for each

Each question has an action, and each action has a place in BuildSphere.

Yes is worth 2 points, sometimes is worth 1 and no is worth 0; on question 10, one system is worth 2, two or three are worth 1, and four or more, 0. Each answer below the maximum becomes an action, and the result shows the three that weigh most on the week: constraints and PPC first, then measurement, material and field. With fewer than three, you get the ones there are; with none, you get the one from question 10.

Method checklist10 items
ItemThe questionAction for next weekBuildSphere frontYour answer
01Do you measure PPC every week?Measure this week's PPC: list what the weekly plan promised and mark what got done.Planning (Last Planner)—
02Does every constraint have an owner and a date?Turn every impediment for next week into a constraint with an owner and a date.Planning (constraints)—
03Does the weekly work plan come from the master schedule?Build next week's plan from the schedule, not from what was left over from the previous one.Planning (look-ahead)—
04Does the subcontractor's progress measurement depend on quality approval?Pay measurements only for work the inspection form approved.Costs and Quality—
05Are your FVS digital?Move the form for the week's most critical activity onto the phone.Quality (FVS)—
06Does material reach the floor before the crew?On Friday, check the material for the floor that starts on Monday.Logistics (kit per floor)—
07Does the field log work on the phone?Start with check-in: the field marks when they arrive and what got done.Field—
08Are budget and planning in the same system?Link each schedule work package to its budget line.Budget (WBS)—
09Is there a weekly meeting covering the reasons for non-completion?In the weekly meeting, record the cause of every task that didn't get done.Lean (rituals)—
10How many systems and spreadsheets does the project use today?List the project's systems and spreadsheets and what each one answers: it is between them that the number gets lost.Executive view—

Next week

Three actions, one project, a single system.

Planning, costs, quality, logistics and field in a single system. Start with the project you are running right now: one person on the engineering team, one project and five people in the field, free forever, no credit card. On paid plans, projects and field crew are unlimited, and field crew members don't pay.